Neither the map nor the text report show short-term lane closures (those where the lane is closed for less than 4 hours) or moving lane closures necessary for some maintenance or construction activities. For information on short-term closures or moving lane closures, please contact the District Engineer for the District or county in question. An underlined "Begin Date" represents planned closures.

Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
2Desha41707.3010.13Alternating East & West Bound01/31/2018Ongoing24 Hours12.00FT 11.00Width Restriction - All Lanes. Alternating lane closures. Job 020622
5White51409.6816.68Alternating North & South Bound06/07/2018Ongoing6:00AM - 8:00PM14.00FT 12.00Asphalt Paving Operation
6Garland70902.363.77Alternating North & South Bound05/19/2018Ongoing9:00 a.m. - 3:00 p.m. FT 11.00Job 060432 - Alternating lanes and width restriction.
6Pulaski100806.707.20East Bound Outside09/24/201858 P.M. - 6 A.M. FT 11.00Job 061331 Subsurface Investigations for project.
6Pulaski100806.757.65East Bound Outside09/17/2018108 p.m. - 6 a.m.12.00FT 12.00EB
6Pulaski100807.107.80West Bound Outside09/24/201858 P.M. - 6 A.M. FT 11.00Job 061331 Subsurface Investigations for project.
5Jackson1412011.4113.25Width Restriction Only06/11/2018Ongoing24 Hours10.00FT13.5011.0016. Asphalt Paving Operation, 18. Shoulder Work, 33. Width Restriction - All Lanes.
4Scott280100.0015.88Alternating East & West Bound09/12/2018On Going7 am to 6 pm11.00FT 8.00 Asphalt Paving Operation and dirt work operations to widen roadway, Project R40104.
6Pulaski30230139.50140.00West Bound Outside09/24/201859 AM - 3 PM FT 24.00CA0602 - Subsurface Utility Investigation
6Pulaski30230140.00140.23East Bound Outside09/24/201859 AM - 3 PM FT 24.00CA0602 - Subsurface Utility Investigation
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
6Pulaski30230140.41140.98Alternating East & West Bound10/14/201816:00 a.m. - 3:00 p.m.19.00FT 16.00 Bridge Inspection by HBM Alternating EB/WB outside lanes
2Grant350301.752.05South Bound08/06/2018Ongoing24 Hours14.00FT 11.00Hydrodemolition and Barrier Wall Installation. Job 012274
7Cleveland350400.009.68Alternating North & South Bound08/01/2018Ongoing6 a.m. - 7 p.m.12.00FT 10.00Asphalt Paving Operation.
5Jackson370507.807.90Alternating North & South Bound09/19/2018724 hours11.00FT 10.00Bridge joint repairs.
5Independence370600.000.13Alternating North & South Bound09/19/2018724 hours11.00FT 10.00Bridge joint repairs.
8Conway40310118.65119.00East Bound Outside09/24/201847 a.m. - 6 p.m. FT 12.00Emergency Pavement Repairs. 200 ft in slow lane
8Faulkner40320120.33121.30West Bound Outside09/24/201847 a.m. - 6 p.m. FT 12.00Emergency Pavement Repairs.
6Prairie40420199.00202.00West Bound Outside04/10/2017Ongoing24 Hours FT 20.00Job BB0610 Concrete Barrier Wall installed on right shoulder
6Prairie40420200.00202.00East Bound Outside04/24/2017Ongoing24 Hours FT 20.00Job BB0610 Concrete Barrier Wall installed on right shoulder
1St.-Francis40510248.00249.00Alternating East & West Bound06/07/2016Ongoing7 p.m. - 9 a.m.12.00FT 11.00Job BB0112 - Access to median
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
1St.-Francis40510248.00249.00Alternating East & West Bound09/26/201826:00 a.m. - 4:30 pm FT 12.00Bridge Inspection Fishing Lake - Alt EB and WB Outside lanes.
1St.-Francis40510248.10264.57West Bound Outside03/29/2018Ongoing7:00 p.m. to 8:00 a.m.14.00FT 11.00BB0116 - WRSF operations
1St.-Francis40510248.10264.57East Bound Outside05/08/2018Ongoing8:00 p.m. to 9:00 a.m.14.00FT 11.00BB0116 - WRSF operations
1St.-Francis40510259.38262.08Alternating East & West Bound06/01/2015Ongoing7pm - 9 am12.00FT 12.00BB0113 and BB0114 - Alternating inside/ outside lanes.
1Crittenden40520264.57274.00Alternating East & West Bound05/02/2016Ongoing8:00 p.m. to 8:00 a.m.14.00FT 11.004 miles lane closures for paving/ditch paving - BB0107.
1Crittenden40520264.84271.45All09/24/201818:00pm-6:30am FT  complete eastbound interstate closure,will be rerouted onto hwy 70,westbound will remain open
1Crittenden40520267.09267.11East Bound Inside09/25/201828:00pm-6:30am14.00FT 12.00hbm working night on accident repair
1Crittenden40520267.09267.11East Bound Inside09/23/201818:00pm-6:30am14.00FT 12.00hbm will be working accident repair at night
10Craighead490400.080.09North Bound Outside09/25/201837:30am-5:00pm14.00FT 12.00Hbm makin repairs to bridge
4Washington5904014.9416.08Alternating North & South Bound02/06/2018On going24 Hours11.00FT 8.00Slide repair alternating lane closures north and south bound Project 040750.
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
9Carroll6205012.0515.78Alternating East & West Bound01/30/2017Ongoing6:00 am - 6:00 pm12.00FT 9.00Width Restriction - All lanes on project 090230.
5Fulton630100.002.07Width Restriction Only06/10/2017Ongoing24 HOURS13.00FT 10.00Width Restriction - All Lanes. Due to AHTD Job 050230
5Sharp630202.793.10Width Restriction Only12/22/2017Ongoing2411.00FT 9.00Width Restriction - All Lanes. Bridge Construction Job 050275
5Sharp630205.405.60Width Restriction Only07/31/2017Ongoing24 Hours12.00FT 9.00Width Restriction - All Lanes. Temporary Bridge Structure - Job 050275
8Faulkner6409017.9320.03Alternating East & West Bound09/22/2016Ongoing24 hrs.12.00FT 11.00Notch and widening highway for Job 012155
5White641000.005.80Alternating East & West Bound06/22/2016ongoing2412.00FT 11.50Width Restriction - Notch and widening
1Cross641501.0314.00Alternating East & West Bound09/25/2017Ongoing24 Hours FT  Job No 012287 - Asphalt Paving Operations and Bridge Parapet Improvements
1Cross641600.0017.33Alternating East & West Bound09/25/2017Ongoing24 Hours FT  Job No. 012287 - Asphalt Paving Operations and Bridge Parapet Improvements.
9Boone650206.1210.49Alternating North & South Bound11/13/2017Ongoing6:00 am - 6:00 pm13.00FT 10.00Width Restriction - All Lanes for Project CA0906.
8Van-Buren650803.027.02North & South Bound06/23/2018Ongoing24 Hours FT 12.00Width restriction in N.B. and S.B. Lane in conjunction with Job 080423 (RE 84 Office).
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
8Van-Buren650803.027.00North & South Bound06/25/2018Ongoing24 Hours FT 12.00Lane restrictions due to construction project 080423 through RE84 Office.
3Hempstead670206.306.50North Bound10/01/201848am-4pm12.00FT 9.00Bridge repairs due to accident
6Pulaski6710011.2415.34North Bound Outside04/04/2017Ongoing8:00 P.M. - 1:00 P.M. FT16.008.50Job CA0605 - Northbound lane restriction
6Pulaski6710011.2415.34South Bound Outside04/04/2017Ongoing7:00 P.M. - 6:00 A.M. FT16.008.50CA0605 - Southbound Lane Restriction - Pulaski County
6Pulaski6710011.2415.34North & South Bound05/11/2018Ongoing24 Hours FT16.00 CA0605 - Height Restriction on Main Lanes Only - Pulaski County
6Lonoke671100.000.54North Bound Outside04/04/2017Ongoing8:00 P.M. - 1:00 P.M. FT 8.50Job CA0605 - Northbound lane restriction - Lonoke County
6Lonoke671100.000.54South Bound Outside04/04/2017Ongoing7:00 P.M. - 6:00 A.M. FT 8.50CA0605 - Southbound Lane Restriction - Lonoke County
6Lonoke671105.006.00South Bound Outside03/28/2017Ongoing24 Hours FT 8.50Job 061102 Precast Barrier Wall installed on outside shldr with reduced lane width
6Lonoke671105.006.00North Bound Outside04/17/2017Ongoing24 hours FT 8.50Job 061102 Precast Barrier Wall Installed on Outside Shoulder with reduced lane widths
5White671309.009.30North Bound Outside09/18/20181024 hours 12.00FT 11.00Bridge joint repairs.
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
10Randolph671807.077.75Width Restriction Only07/05/2016Ongoing24 Hours12.00FT 11.00Width Restriction - All Lanes.
7Columbia820402.244.30All07/03/2017Ongoing24 hours10.00FT20.0010.00Both Shoulders closed with Traffic Drums and Vertical Panels. Narrow Roadway Width
2Ashley8208016.0017.25Right Shoulder11/14/2017Ongoing24 hours12.00FT 11.00Width Restriction - All Lanes. Alternating Shoulder Closures. Job 020534
8Johnson1030100.000.60North & South Bound08/07/2013ongoing24 Hours11.00FT 11.00Width Restriction - All Lanes. Installation of Centerline Islands with Light Poles
4Washington11200S0.000.25West Bound Outside09/17/2018319 am - 3 pm12.00FT 9.00Sidewalk repairs at the back of curb.
8Johnson1230400.300.40Right Shoulder09/22/2017ongoing24 Hours 10.00FT 10.00Drainage System Installation.
7Union1670200.303.80Width Restriction Only12/14/2016Ongoing24 hours12.00FT 9.00ACHM leveling closed shoulders at various locations.
7Union1670204.204.90Width Restriction Only12/14/2016Ongoing24 hours12.00FT 9.00Concrete barrier wall for culvert extensions closed southbound shoulder
7Calhoun1670305.006.00Width Restriction Only05/24/2017Ongoing24 hours12.00FT 9.00Leveling operations closed shoulders.
7Calhoun1670401.005.00Width Restriction Only04/11/2018ongoing249.00FT 9.00Notch
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
9Carroll1870106.056.31All10/02/20181424 Hours FT  Closing to perform required maintenance on Beaver Dam.
3Little-River2340100.0010.25All07/19/2018Ongoing24 Hours FT  Hwy. 234 closed completely to through traffic at log mile 1.41 for culvert replacement (Job 030487)
1Lee2380208.009.00All07/23/20186824 Hours FT  Job 110621 - Box Culvert work.
8Pope2470100.007.05Alternating North & South Bound08/21/2018Ongoing6:00 a.m. - 8:00 p.m.10.00FT 10.00Width Restriction, Asphalt Paving Operation.
4Washington2650209.169.18Alternating North & South Bound09/17/201877AM-5PM FT  Turning lanes closed for new signal head placement
6Garland27005018.2422.91East Bound Inside05/15/2018ongoing9a-3p FT 16.00cleaning inside wall - this might take 2 weeks to complete all sides
6Garland2700600.004.00East Bound Inside05/16/2018ongoing9a-3p FT 16.00cleaning inside wall - this might take 2 weeks to complete all sides
3Nevada2990209.169.20North Bound09/25/201838am-4pm13.00FT 10.00Bridge Repairs due to accident
5White3671700.007.45Alternating North & South Bound06/19/2018Ongoing6:00AM - 8:00PN14.00FT 12.00Asphalt Paving and Bridge Repair Operations
6Pulaski4302101.532.03North Bound Center & Inside09/16/2018Ongoing10 p.m. - 5 a.m.12.00FT 12.00Job BB0618 Median and bridge work at Rodney Parham Intchg.
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
6Pulaski4302101.532.03North Bound Inside09/16/2018Ongoing8 p.m. - 6 a.m.12.00FT 12.00Job BB0618 Median and bridge work at I-430
6Pulaski4302101.532.03South Bound Inside09/16/2018Ongoing8 p.m. - 6 a.m.12.00FT 12.00Job BB0618 Median and bridge work at I-430
6Pulaski4302101.532.03South Bound Center & Inside09/16/2018Ongoing10: p.m. - 5 a.m.12.00FT 12.00Job BB0618 Median and bridge work at I-430
2Jefferson53005035.0046.30North & South Bound11/28/2017Ongoing24 Hours FT 12.00Crossover-both directions on Southbound side. Median and Outside Shoulder Work. Job BB0203
10Poinsett55502013.0015.00North & South Bound08/06/2018on24 hours15.00FT 12.00Job 100956 Bridge work
10Poinsett55502017.0030.50Alternating North & South Bound07/30/2018On going24 hours 15.00FT 13.00Job 100957 - Mill and Inlay ACHM , Bridge Rehabilitation, Guardrail replacement
10Craighead55503031.0041.00Alternating North & South Bound05/30/2018Ongoing24 hours16.00FT 14.00Job 100958 - Rehabilitation work on Bridges and Replacing Guardrail
10Craighead55503039.8039.88South Bound Outside09/24/201847am-5:30pm14.00FT 12.00Hbm making repairs
6Pulaski6302104.007.00East & West Bound07/16/2018Ongoing8 p.m. - 6 a.m. FT  Job CA0608. Nightly and Saturday EB and WB double lane closures during off-peak hours.
6Pulaski6302105.405.60All07/20/20189624 Hours FT  Job CA0608. Hughes Street Bridge Closed for removal and reconstruction.